Prince Engineering has performed over 500 projects for a variety of clients throughout the Southeast.  A few of our recent projects are summarized in the list of projects on the right.

For more on what we can do for you, see our list of services and our clients and partner companies.

Fuji Photo Film, Greenwood SC

Piping and Structural design for the installation of the P7 process upgrades in the P Plant at Fuji’s Greenwood facility. Scope included equipment layouts, detailed process skid drawings, schematic plan drawings and detailed isometrics with bill of materials. Worked with Carolina Design PC to provide structural design for process vessel support and access platforms.

PPG Fiberglass, PDA Design, Shelby, NC

Mechanical and Piping design for Shelby 526 Paper Conversion upgrade with PDA Design for PPG. Scope included forehearth layout modifications, forehearth combustion system modifications, new chopper based forming equipment installation, new binder distribution system, new process dryer system, forming utility piping replacement, and HVAC ductwork modifications.

Clean Burn Fuels LLC, Raeford, NC

Mechanical, Piping, and Structural design for the main utility systems for Clean Burn Fuel's new 60 million gallon per year ethanol production facility in Raeford, NC. Scope included the development of P&ID's, equipment layouts, and piping design for the chilled water, cooling water, and steam production systems. Scope also included HVAC and plumbing design for the chiller building, boiler building, and control room building. Worked with Carolina Design PC to provide structural and foundation design for the chiller building, boiler building, and control room building.

PPG Fiberglass, PDA Design, Shelby, NC

Piping Design for Shelby 524 Forehearth Oxyfuel upgrade with PDA Design for PPG.  Scope included piping detail design for conversion of the existing forehearth multi zone combustion system from a mixed natural gas and air fired system to a natural gas and pure oxygen fired system using individual mixing burners.

PPG Fiberglass, PDA Design, Chester, SC

Mechanical and Piping design for Chester 501 furnace rebuild with PDA Design for PPG. Scope included modification and replacement of existing 30" Incoloy pollution control ductwork, replacement of high temperature expansion joints, modification of melter stack cap doors, replacement of process cooling water piping, addition of back up air compressor system, and replacement of batch house system silo outlet valving.  Worked with Carolina Design PC to provide structural design for the rework of the quench tower access platforms to accomodate ductwork modifications.

Parachem Inc., Simpsonville SC

Process, Piping and Structural design for the installation of a new 120,000 gallon waste storage system for Parachem’s Simpsonville facility. System included four (4) 30,000 gallon storage tanks and a 675 gallon waste collection sump with a duplex set of 150 gpm diaphragm pumps. Scope included P&ID’s, equipment layout, piping design, and control system specification. Worked with Carolina Design PC to provide foundation design for the storage tanks.

Camden County MUA, PKF-Mark III, Camden NJ

Piping and Structural design for new thermal fluid primary/secondary system with PKF-Mark III for Camden County MUA’s new sludge drying system facility. System included two (2) 12.0 MMBTU/hr gas fired thermal fluid heaters, a common system expansion tank, a primary pump skid, and six (6) secondary pump skids provided by Sigma Thermal. Scope included equipment layout, piping design drawings, pipe support design, and system stress analysis. Worked with Carolina Design PC to provide structural pipe supports for the thermal oil and sludge transport systems.

Michelin US10, O'Neal, Inc., Starr, SC

Mechanical and Piping design for the new central utility systems in the 124 building with O'Neal for Michelin's new US 10 earthmover tire plant in Starr, SC. Major equipment included two (2) 80,000 lb/hr boilers with 75' dual wall stacks, three (3) 2300 ton cooling towers with common sump, and three (3) 1400 ton chillers. Scope included equipment layouts, and piping and support design for the chilled water, cooling water, boiler feedwater, compressed air, process water, process cooling water, soft water, fuel oil, and steam production systems. Scope also included HVAC design for the chiller area and boiler areas in the 124 building.

GE Gas Turbine, Renfrow Brothers, Inc., Greenville, SC

Piping 3D model and isometric fabrication drawings for the technology lab's RGT upgrades in the gas turbine test cells area. Systems upgraded included injection, condenser water, exhaust gas recirculation, and process air systems. The 3D model was created using AutoCAD Plant 3D from P&ID's and 2D drawings supplied by others. Eighty seven (87) isometric drawings including bill of material, piping cut list, valve tags, piping specification, and dimensional data were generated from the model for Renfrow's use in shop fabrication

GE Gas Turbine, Palmetto Engineering Inc., Greenville, SC

Piping design for the relocation of an existing bucket repair process from Houston, TX into a upfited 28,000 square foot existing warehouse area in GE’s Greenville facility with PEC. Over eighty (80) pieces of equipment were relocated or repurposed included vacuum furnaces, robotic coating cells, weld booths, and various metal working machines. Scope included field verification of system tie in points, piping design for the compressed air, process water, process cooling water, argon, nitrogen, oxygen, hydrogen, process drain, and exhaust distribution piping, piping support details, and equipment piping hook up details.

Morinaga Inc., Keystone Constructors, Mebane, NC

Piping shop fabrication drawings for sanitary stainless steel hot water jacketed glucose and oil systems for Morinaga's new facility in Mebane, NC. Used 3D model and 2D drawings supplied by others to create three hundred and seventy (370) spool drawings including bill of material, piping cut list, valve tags, piping specification, and dimensional data for Keystone's use in shop fabrication.

Millennium Mat, Performance Heating, LLC, Suwannee, GA

Piping design for a new 8 MMBTU/hr gas fired Garoni Naval thermal fluid heater system feeding five (5) secondary loops for Millennium Mat’s new production facility in Suwannee, GA. Scope included equipment layout, piping design drawings, pipe support design, and system stress analysis. Heater room piping was modeled in AutoCAD Plant 3D and isometrics with bills of material were generated to assist fabrication.

For some uk replica watches low-end brands, due to cost and positioning, generally do replica watches not use precious metals, but to the gold-plated stainless steel, sometimes gold-plated, sometimes decorated with replica watches uk rose gold, so that the watch is more luxurious and honorable, but swiss replica watches also Can save costs, reduce the price of watches.