3D Model – General Electric Gas Turbine, Palmetto E & C, Inc., Greenville, SC
Piping study of the existing argon bulk gas distribution systems in the Manufacturing and Combustion buildings at GE’s Greenville facility with PEC. Scope included field verification of the system routing, development of a 3D model of the systems, and development of network flow model of the system to evaluate existing and future pressure drops.