FMC – Lithium, O’Neal Inc., Bessemer City, NC
Piping design for the 3rd Effect Evaporator Replacement project in the LIOH process at FMC-Lithium’s existing production facility in Bessemer City, NC. Scope included field verification of system tie in points, piping design for new piping, and piping support details. Thirty (30) isometrics with bills of material were generated to assist shop fabrication of the piping due to shutdown time limitations.