Palmetto, logo, mechanical, Piping, design, Prince Engineering, South Carolina

GE Gas Turbine, Palmetto Engineering Inc., Greenville, SC

Piping design for the relocation of an existing bucket repair process from Houston, TX into a upfited 28,000 square foot existing warehouse area in GE’s Greenville facility with PEC. Over eighty (80) pieces of equipment were relocated or repurposed included vacuum furnaces, robotic coating cells, weld booths, and various metal working machines. Scope included field verification of system tie in points, piping design for the compressed air, process water, process cooling water, argon, nitrogen, oxygen, hydrogen, process drain, and exhaust distribution.