Michelin US10, O’Neal, Inc., Starr, SC
Mechanical and Piping design for the new central utility systems in the 124 building with O’Neal for Michelin’s new US 10 earthmover tire plant in Starr, SC. Major equipment included two (2) 80,000 lb/hr boilers with 75′ dual wall stacks, three (3) 2300 ton cooling towers with common sump, and three (3) 1400 ton chillers. Scope included equipment layouts, and piping and support design for the chilled water, cooling water, boiler feedwater, compressed air, process water, process cooling water, soft water, fuel oil, and steam production systems.