Millennium Mat, Performance Heating, LLC, Suwannee, GA

Piping design for a new 8 MMBTU/hr gas-fired Garoni Naval thermal fluid heater system feeding five (5) secondary loops for Millennium Mat’s new production facility in Suwannee, GA. Scope included equipment layout, piping design drawings, pipe support design, and system stress analysis. Heater room piping was modeled in AutoCAD Plant 3D and isometrics with bills of material were generated to assist fabrication.