Parachem Inc., Simpsonville SC
The process, Piping and Structural design for the installation of a new 120,000-gallon waste storage system for Parachem’s Simpsonville facility. The system included four (4) 30,000-gallon storage tanks and a 675-gallon waste collection sump with a duplex set of 150 GPM diaphragm pumps. Scope included P&ID’s, equipment layout, piping design, and control system specification. Worked with Carolina Design PC to provide foundation design for the storage tanks.